Heathrow, Terminal 2

Heathrow, Terminal 2

Installation of the exterior fins

The Project

SFC designed, detailed, manufactured and installed a number of Glazing/Cladding support structures on one of the new buildings as part of the recent Terminal 2 developments including two ten metres high 'toblerone' shaped sections delivered to site already fully assembled and craned into position under full airside conditions. Highly accurate detailing and manufacture resulted in no on site modifications to either the large toblerone sections or the hundreds of other smaller steel members on the project.

Installation of the exterior fins