View of Liverpool Museum from outside

Liverpool Museum, Liverpool

Construction of the exterior
View from inside looking out

The Project

SFC designed, detailed, manufactured and installed feature steelwork for this unique project as part of Liverpool's recent regeneration. The main support steels spanned over ten metres and were also angled in two directions making accurate manufacture and installation critical for the success of the project. The complex geometry of the support steelwork necessitated the need for us to supply a specialist site engineer to ensure correct set out for the steelwork & glazing support brackets.

Construction in progress